ARIAPUR system is a unique solution that meets the advantages of various facilities for a pleasant and healthy.
. The company’s technology Valsir Spa ARIAPUR system because its strategy adopted in innovation, has launched a revolutionary product, which required much time and eliminate problems quickly evacuating both the odor and prevent the spread of bacteria

ARIAPUR system description
The system comprises the following components:
- box fan installation
- fan cover plate
- mouth out of the box
- inlet in the box
The box is built into walls, near the spine of sewage, which is connected through a tube and PP to evacuate all pollutants. Ariapur system is effective because it eliminates odors forces and prevent the spread of bacteria even in the toilet bowl.
The fan has a large suction capacity for D = 100 m3 bathroom and creates a general depression of 340 Pa max. The front panel allows aspiration all four sides of its function remote fan find absorption directly from the toilet bowl.
In addition the side holes of vicious air suction fan in the bathroom environment. Clearing the air is inserted into the bathroom through a grid frame practiced in the bottom of the door.
Panel grills suction hide prone to dust. Air filter is a simple cleaning. Very low noise level that is 35 dB, due to a ventilation system with a special construction which allows a reduction in noise
Operation is automatic with various types of electrical controls. The box connects to the toilet, if space toilet, wash tube and a breath of air through the exhaust tube. The two connections are moneaza PP.
Has the effect of getting a fresh air. The internal function of slight leak or backflow, ensure that a centralized facility, each machine can not influence ARIAPUR suction capacity of the other in case of mounting multiple pollutants in the environment thus preventing the return of the bathroom.
Device structure allows the connection in many places the exhaust air tube infested with noxious bacteria, which makes this product to be flexible and easily adapted to different installation requirements. Because adjustable front panel can be installed on wall or ceiling following a few simple operations.
. This system can be successfully applied to any model semiinaltime buried tank.

1. Masonry
Mounting buried
The first phase consists in an excavation in the wall where to settle the case, suction, exhaust fan and conduction. To install the tank, follow the instructions provided by the manufacturer.
It is necessary that the hole (gap) to be large enough to allow the laying of the pipeline, if possible, use elbows to 45 degrees, avoid bends at 90 °. It is necessary near the fan to install an outlet for current. If installed in plaster walls, suction and exhaust will be positioned between wall and plasterboard wall and secured by conventional clamps.
The fan must be fixed to the wall with mounting bracket, perpendicular to the housing.

2. POSITIONING THE PIPES
It is possible to connect the various types of pipes. A suction D50 is enough for a good running aventilatorului. Connection to the suction mouth can be made with pipe connection systems Ǿ 80/50 PVC Ǿ 80/50/50 PP, HDPE.
Fan exhaust pipe should be driven from the exhaust pipe fan D75/76/80 be connected to the column of air, whose size must be calculated. It is important to connect the column to be used in a branch 45 and to facilitate evacuation of air drawn.

3. PREPARATION housing FAN
After all type of pipe installation, a cutter is one hole in the casing and the bottom, where it will be connected to the buried tank. Pass the power cord from the back inside cover is placed in the hole made in the wall and connect the output and input lines.

Flap
Flap must be mounted so close under its own weight. If incorrectly installed may not shut down and get in ambient odors. It then mounted on the wall protection plate.

4. Definitive closure
The last phase of work consists of closing and finishing parts built and installing tile. The fan is connected to the electrical installation this last stage: it will be started by the present sensor or a light switch.
If the wall is 80mm thick, it is necessary to purchase a frame that is mounted spacer plate inchidere.Pentru good fan efficiency, it is necessary that the bathroom door to be mounted at the bottom of an air inlet grille to avoid entering the environment to cause a decrease depression sis flow fan.

AIR COLUMN MAIN DIMENSIONING
For sizing column refers to two main configurations for installation:
1. The first is composed of a ARIAPUR for each floor
2. The second floor of two ARIAPUR
  • Simultaneity factor in use is 100% (all equipment is in operation PUR AREA)
  • The main column is upright
  • The main column has the same diameter throughout its height
  • Residual output pressure is 75Pa
  • Roughness of the pipe used is 0.15mm
  • Each floor height is 2.75m
  • Column length from floor to play the end is 1.5m
  • Side pipes are made of pipes DN 80 to 2m in length, containing two elbows.
PP and PVC pipe diameter to achieve the main column of air

Main column diameter DN (mm)
100
125
150
200
250
315
Maximum number of floors (a suction device on the floor)
2
4
6
10
15

Maximum number of floors (two suction device on the floor)
1
2
3
6
9*
13

* One ARIAPUR the floor

INSTALLATION INSTRUCTIONS
1. Wall mounting
1.. Insert the cartridge in the box wall to install the fan, carefully because it can distort
2. Remove the lid of the box installation inspection of the fan. Mounting brackets are mounted by screws on the fan box installation.
3.. Mark the mounting holes for mounting brackets on the rear panel, and enter the purlin clamps. Prepare material fixing installation point
4. Insert the power cord in the back of the box to install the fan.
5. For acoustic insulation of the box to install the fan using rubber bands spongy wall.
6. Insert the installation box carefully through the fan mounting bracket into place and fix the wall.
 7. The discharge is cupleza residual air with exhaust air tight sleeve.
8. Electrical connections are made
 9. Enter inspection cover in the box to install the fan, the fan is mounted with edge grip at the same level, taking into account the thickness of the bricks.

INSTALLATION INSTRUCTIONS
2. Surface mounting
1. Remove the lid of the box installation inspection of the fan
.2. If the cap is removed, install the fan box is installed directly on the ceiling. Securely box installation of ceiling fan installation
.3. If the cap is removed, the box is fixed by installing the fan mounting. Cut appropriate fixing brackets, bend and mounted the box to install the fan with the appropriate screws.
4. It means fixing holes for the box to install the ceiling fan, and enter the purlin clamps.
5. Insert the power cord from the back of the box to install the fan
6. Fit box to install the ceiling fan.
7. Close tightly fitting with the sleeve for blowing air.
8. Input is connected to the pipe sleeve that comes from toilets.
9. Electrical connection is made.
10. Enter the inspection cover and then install the fan box with edge grip at the same level.

INSTALLATION INSTRUCTIONS
Electrical Connection
Correct electrical connection must be made when mounting the box to install the fan in case the box and should be done only by qualified persons. Power line cables are used only section of at least 1.5mm2. To connect the fan is necessary to properly cut the power line cable, remove the gasket and connects to the terminal closure. Cord length is up to 7 cm in order to introduce easily ventilate
Cut and insulate conductors and protective conductors not necesari.La this type of connection can bind and illuminate the room. The fan starts to work immediately. After closing the switch, fan continues to run for another 6 minutes.

WARNING
If there is a bad electrical connection to the fan, failure will occur, in which case of course Valsir SpA is not liable for damages.

MAINTENANCE
Removing fan
1. It will open the
2. The screw fixing desfileteaza plate covering the fan
3. Press the locking rods in the center until slightly higher fan out from the fixing points.

Changing the filter
1. Open the lid
2. Remove and replace filter cloth
3. Place on grid suction filter, to remove deposits and close the lid (should be heard latch)
4. Filter change every 6 months

Spare parts

Full inner cover plate comprises:
  • Cover plate
  • Plate for a record second toilet or ambient
  • 60 / 100 ZF filter cloth, filter EU2 class
  • Fan Box Installation
  • Spacer for wall thickness from 80 to 105 mm if necessary
  • 2 mounting kit and fixing screws on the fan housing wall or between walls
  • Washing tube for connecting the system to flush tank type ARIAPUR TROPEEA-RIOS
  • Or wash tube for connecting the system to flush tank type ARIAPUR WINNER - ANGEL
  • Aeration column color PP material gri.Ǿ 110/110
  • Universal PP pipes for venting flawed

Niciun comentariu: